Concrete -
Industrial Projects
Kronospan
Eastaboga,
Alabama: Building foundations, slab
on grade, equipment foundations, and
concrete paving for a wood based
panel manufacturing facility |
Delphi Packard Electric
Tuscaloosa, Alabama:
Foundations, slab on grade, tilt-up
panels, and concrete paving for an
80,000 SF automotive supplier |
Hwashin America Corporation
Greenville,
Alabama: Building foundations,
equipment pits and tunnels, slab on
grade, and concrete paving for an
automotive stamping facility |
Tecumseh Products Company
Douglas, Georgia: Foundations,
slab on grade, tilt-up panels, and
concrete paving for a 320,000 SF
engine manufacturing facility |
National Alabama Corporation
Cherokee,
Alabama
Foundations, pits, slab on grade,
tilt-up wall panels, and general
trades package for a 2,100,000 S.F.
rail car manufacturing facility |
Georgia Pacific
Irwin, Tennessee: Foundations,
slab on grade, and concrete paving
for a 152,000 SF warehouse facility |
Teksid
Sylacauga, Alabama: Foundations,
pits, walls, and slabs for a 350,000
SF automobile engine manufacturing
plant |
Georgia Pacific
Birmingham, Alabama:
Foundations, slab on grade, and
concrete paving for a 126,000 SF
warehouse facility |
Briggs & Stratton “V” Twin
Auburn, Alabama: Foundations and
pits for an engine manufacturing
plant |
Briggs & Stratton Corporation
Statesboro, Georgia:
Miscellaneous pits and slab on grade
for a 65,000 SF die-cast facility |
Mi-Tech Steel
Decatur, Alabama: Building
foundations, equipment pits, and
equipment foundations for a 162,000
SF steel pickling and slitting
facility |
Briggs & Stratton Corporation
Auburn, Alabama: Caisson caps,
grade beams, spread footings,
continuous footings, miscellaneous
concrete pits, slab on grade, and
concrete paving for a 315,000 SF
engine manufacturing facility |
Tapecraft
Oxford, Alabama: Building
foundations and slab on grade for a
160,000 SF high quality webbing
manufacturing plant |
Russell Mills Spinning Mill
Wetumpka, Alabama: Concrete
foundations, walls, and slab on
grade for a 360,000 SF textile mill |
Marubeni Denim
Columbus, Georgia: Building
foundations, equipment pits, and
equipment foundations for a 265,000
SF state of the art denim
manufacturing facility |
Flex-N-Gate
Bessemer, Alabama: Demo of
existing press pit, construction of
new press foundations, and
construction of a new 40-ton
overhead crane structure for an
automotive stamping facility |
Gerdau Ameristeel
Cartersville, Georgia: Equipment
foundations for a steel rolling mill
(formerly Birmingham Southeast, LLC) |
Nissan Manufacturing Facility
Dechard, Tennessee: Foundations
and pits for an automobile
manufacturing facility |
Sterilite Corporation of Alabama
Phase 1, 2, 3,
Birmingham, Alabama:
Foundations, slab on grade, tilt-up
panels, and retaining walls for a
1.2mm SF injection molding facility |
Toto Manufacturing
Atlanta, Georgia: Equipment
foundations and pits for a toilet
manufacturing facility |
G.M. Packard Electric
Gadsden, Alabama: Foundations,
slabs, and tilt-up walls for a
245,000 SF manufacturing and
warehouse facility for an automotive
supplier |
Airco, Inc.
Birmingham, Alabama: Foundations
and structures for an environmental
gas manufacturing facility |
Precision Strip, Inc.
Talladega, Alabama: Foundations
and slabs for a 100,000 SF flat
rolled steel processing facility |
Matsushita Lithium
Columbus, Georgia: Building
foundations, equipment foundations,
and slab on grade for a 100,000 SF
battery manufacturing plant |
GNB Battery
Columbus, Georgia: 40,000 SF
slab on grade using type K concrete |
Rehau, Inc.
Cullman, Alabama: Foundations,
structures, slabs, and pits for a
156,000 SF automobile bumper
manufacturing facility |
Redman Homes
Talladega, Alabama: Foundations,
grade beams, slab on grade, and
concrete paving for a 150,000 SF
manufactured home plant |
Shelby Commerce Park
Calera, Alabama: 500,000 SF
tilt-up warehouse |
Learn more
about our Industrial Concrete Services
|